Shilshole 05Apr12 * SG106 * Dive index * Mission links * Dive 3 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 5.71 of 150.00 AH used of 24V (96.19% remains)
• Previous NAKs 0, Timeouts 0 • 5.94 of 98.00 AH used of 10V (93.94% remains)
• Surface angle -1.4 deg, depth -1.18 m • Intended pitch -25.8 deg, speed -10.000 cm/s
VBD pumped to 150.12 (SM_CC=150)
• GPS1 time: 11 s, HDOP was 2.3 m
• GPS2 time: 12 s, HDOP was 2.2 m
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
13 end surface: CONTROL_FINISHED_OK
13 begin dive
15 - - - 40 VBD -0.87 - - 136 - - - 2056 - -4.9 -23.77 - 3300 - - - - - - - - - - -
41 3.2 -9.8 3 60 roll -0.87 5.38 0.050 2128 370.3 2.53 0.079 652 -554.9 -4.9 -5.20 - 3413 -21.7 - - - - - - - 25.62 25.54 25.80
284 27.7 -10.4 51 291 done -0.87 - - 2127 - 2.47 0.047 2067 572.9 -4.9 - - 3414 - - - - - - - - - 25.57 -
350 34.2 -10.1 64 357 roll -0.87 - - 2124 - 2.55 0.065 657 -552.9 -4.9 - - 3415 - - - - - - - - - 25.52 -
460 end dive: TARGET_DEPTH_EXCEEDED
460 begin apogee
465 45.3 -10.0 86 471 done -0.17 0.57 0.057 2346 389.5 - - 2071 - - 1.92 0.162 3387 -14.6 0.394 - - - - - - 25.57 - 25.39
472 end apogee: CONTROL_FINISHED_OK
472 begin climb
473 44.6 - 87 480 roll 0.87 0.90 0.058 2678 368.9 2.55 0.066 3473 549.8 4.9 1.35 0.174 3367 -14.8 0.367 - - - - - - 25.59 25.54 25.38
704 21.0 10.1 133 711 done 0.87 - - 2679 - 2.47 0.045 2064 -570.4 4.9 - - 3369 - - - - - - - - - 25.58 -
770 14.5 9.8 146 777 roll 0.87 - - 2678 - 2.55 0.063 3468 550.6 7.3 - - 3369 - - - - - - - - - 25.52 -
885 end climb: SURFACE_DEPTH_REACHED
885 begin surface coast
910 end surface coast: CONTROL_FINISHED_OK
910 begin surface
SM -1.12 - - - - -7.00 7.03 0.052 130 -362.4 2.47 0.044 2063 -568.8 150.12 49.83 0.125 2777 -11.9 -0.011 - - - - - -