PortSusan 02Sep10 * SG107 * Dive index * Mission links * Dive 26 * Raw log
prev dive * next dive * dive
• Previous call tries 2 • 2.04 of 91.80 AH used of 24V (97.78% remains)
• Previous NAKs 0, Timeouts 0 • 0.68 of 61.20 AH used of 10V (98.89% remains)
• Surface angle -68.4 deg, depth 0.45 m • Intended pitch -22.5 deg, speed -10.000 cm/s
VBD pumped to 325.02 (SM_CC=325)
• GPS1 time: 40 s
• GPS2 time: 16 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
11 end surface: CONTROL_FINISHED_OK
11 begin dive
13 - - - 98 done -1.62 - - 360 - - - 2065 - -96.6 -79.30 - 3585 - - - - - - - - - - -
100 3.5 -11.1 15 118 roll -1.62 11.02 0.180 2216 168.4 2.67 0.069 647 -531.1 -96.6 - - 3586 - - - - - - - - - - -
325 31.8 -11.8 47 332 done -1.62 - - 2216 - 2.50 0.038 2053 562.4 -96.6 - - 3587 - - - - - - - - - - -
516 52.1 -11.0 66 520 roll -1.62 - - 2216 - 2.60 0.058 3472 545.8 -96.6 - - 3587 - - - - - - - - - - -
612 62.6 -10.8 75 616 done -1.62 - - 2216 - 2.58 0.050 2059 -547.7 -96.6 - - 3587 - - - - - - - - - - -
869 end dive: TARGET_DEPTH_EXCEEDED
869 begin apogee
874 90.6 10.5 100 959 done -0.33 1.40 0.112 2494 198.6 - - 2058 - - 76.90 0.569 3193 -5.1 0.084 - - - - - - - - -
959 end apogee: CONTROL_FINISHED_OK
959 begin climb
962 93.2 - 108 1042 done 1.62 2.00 0.069 2924 215.0 - - 2058 - 96.6 76.15 0.562 2799 -5.2 0.089 - - - - - - - - -
1347 59.2 9.6 146 1359 done 1.63 - - 2924 - - - 2058 - 102.0 5.80 0.443 2777 -3.8 0.052 - - - - - - - - -
1669 29.5 8.6 177 1691 roll 1.65 - - 2924 - 2.65 0.054 3473 534.0 122.4 17.48 0.513 2693 -4.8 0.029 - - - - - - - - -
1706 26.1 8.6 180 1727 done 1.68 - - 2924 - 2.60 0.050 2056 -545.0 142.7 16.95 0.506 2611 -4.8 0.026 - - - - - - - - -
1919 4.9 9.2 214 1937 roll 1.69 - - 2924 - 2.70 0.075 653 -519.6 154.2 10.40 0.477 2563 -4.6 0.005 - - - - - - - - -
1950 end climb: SURFACE_DEPTH_REACHED
1950 begin surface coast
1993 end surface coast: CONTROL_FINISHED_OK
1994 begin surface
SM 0.80 - - - - -10.20 - - 357 - - - 2080 - 325.02 89.60 0.470 1868 -7.8 0.001 - - - - - -