PortSusan 28Jun07 * SG001 * Dive index * Mission links * Dive 25 * Raw log
prev dive * next dive * dive
• Previous call tries 5 • 13.22 of 91.80 AH used of 24V (85.60% remains)
• Previous NAKs 0, Timeouts 0 • 1.92 of 61.20 AH used of 10V (96.86% remains)
• Surface angle -50.0 deg, depth 0.34 m • Intended pitch -20.0 deg, speed -10.000 cm/s
VBD pumped to 450.37 (SM_CC=450.37079) • surface range 0.1 m at 0.3 m depth, ceiling 0.2 m
• GPS1 time: 10 s • bottom range 28.9 m at 75.3 m, depth 104 m (100 m grid)
• GPS2 time: 24 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
38 end surface: CONTROL_FINISHED_OK
38 begin dive
44 - - - 121 done -1.21 - - 650 - - - 2093 - -121.6 -67.28 - 2760 - - - - - - - - - - -
127 2.6 -5.6 10 145 roll -1.21 7.10 - 2036 195.2 2.72 - 424 -613.6 -121.6 - - 2763 - - - - - - - - - - -
417 38.4 -11.6 57 426 done -1.21 0.38 - 1960 -200.0 3.10 - 2203 573.9 -121.6 - - 2755 - - - - - - - - - - -
789 81.7 -11.8 118 798 roll -1.21 0.28 - 2033 260.7 2.50 - 3595 556.8 -121.6 - - 2765 - - - - - - - - - - -
952 end dive: TARGET_DEPTH_EXCEEDED
952 begin apogee
968 100.5 10.5 145 1077 done -0.25 0.90 - 2244 234.4 - - 1945 - - 99.72 - 2263 -5.0 - - - - - - - - - -
1082 end apogee: CONTROL_FINISHED_OK
1082 begin climb
1088 108.1 - 151 1097 VBD 1.21 1.60 - 2553 193.1 - - 1931 - 121.6 5.45 - 2227 -6.6 - - - - - - - - - -
1098 end climb: SURFACE_DEPTH_REACHED
1098 begin surface coast
1102 end surface coast: CONTROL_FINISHED_OK
1102 begin surface
SM 0.34 - - - - -7.42 - - 648 - - - 2059 - 450.37 277.02 - 426 -6.5 INF - - - - - -