PortSusan 28Jun07 * SG001 * Dive index * Mission links * Dive 13 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 10.97 of 91.80 AH used of 24V (88.04% remains)
• Previous NAKs 0, Timeouts 0 • 1.61 of 61.20 AH used of 10V (97.37% remains)
• Surface angle -50.0 deg, depth 0.34 m • Intended pitch -20.0 deg, speed -10.000 cm/s
VBD pumped to 375.31 (SM_CC=375) • surface range 10.6 m at 9.9 m depth, ceiling -0.7 m
• GPS1 time: 22 s • bottom range 27.2 m at 75.2 m, depth 102 m (100 m grid)
• GPS2 time: 28 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
32 end surface: CONTROL_FINISHED_OK
33 begin dive
39 - - - 112 done -1.21 - - 678 - - - 1863 - -121.6 -66.90 - 2757 - - - - - - - - - - -
118 2.8 -5.5 9 136 roll -1.21 6.50 - 2041 209.7 2.53 - 3598 685.8 -121.6 - - 2751 - - - - - - - - - - -
412 36.4 -11.1 56 421 done -1.21 0.08 - 2027 -175.0 3.00 - 1791 -602.3 -121.6 - - 2751 - - - - - - - - - - -
790 76.8 -10.8 117 799 roll -1.21 - - 2018 - 3.25 - 383 -433.2 -121.6 - - 2747 - - - - - - - - - - -
1021 end dive: TARGET_DEPTH_EXCEEDED
1021 begin apogee
1037 100.3 10.2 155 1151 done -0.25 1.23 - 2262 198.4 - - 2125 - - 98.05 - 2265 -4.9 - - - - - - - - - -
1151 end apogee: CONTROL_FINISHED_OK
1151 begin climb
1157 105.8 - 161 1265 roll 1.21 1.52 - 2585 212.5 2.95 - 3519 472.5 121.6 98.50 - 1764 -5.1 - - - - - - - - - -
1543 65.2 12.4 210 1552 done 1.21 0.40 - 2479 -265.0 2.60 - 1845 -643.8 121.6 - - 1757 - - - - - - - - - - -
1914 20.9 11.4 271 1923 roll 1.21 0.45 - 2571 204.4 2.72 - 3516 614.3 121.6 - - 1768 - - - - - - - - - - -
2093 end climb: SURFACE_DEPTH_REACHED
2093 begin surface coast
2114 end surface coast: CONTROL_FINISHED_OK
2114 begin surface
SM 0.34 - - - - -7.55 - - 632 - - - 1845 - 375.31 158.93 - 724 -6.6 INF - - - - - -