Shilshole 05Apr12 * SG106 * Dive index * Mission links * Dive 11 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 5.71 of 150.00 AH used of 24V (96.19% remains)
• Previous NAKs 0, Timeouts 0 • 5.94 of 98.00 AH used of 10V (93.94% remains)
• Surface angle -1.6 deg, depth 0.13 m • Intended pitch -25.8 deg, speed -10.000 cm/s
VBD pumped to 150.12 (SM_CC=150)
• GPS1 time: 10 s
• GPS2 time: 14 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
18 end surface: CONTROL_FINISHED_OK
18 begin dive
20 - - - 45 VBD -0.87 - - 129 - - - 2063 - -4.9 -24.25 - 3337 - - - - - - - - - - -
47 3.3 - 2 70 roll -0.87 5.32 0.045 2126 375.4 2.50 0.071 657 -562.4 -4.9 -3.28 - 3412 -22.9 - - - - - - - 25.60 25.55 25.77
401 39.5 -9.8 49 413 done -0.87 - - 2126 - 2.40 0.044 2072 589.6 -4.9 - - 3412 - - - - - - - - - 25.60 -
457 end dive: TARGET_DEPTH_EXCEEDED
457 begin apogee
460 45.3 -9.7 56 471 done -0.17 0.57 0.053 2348 389.5 - - 2072 - - 1.77 0.146 3387 -14.1 0.423 - - - - - - 25.57 - 25.40
477 end apogee: CONTROL_FINISHED_OK
477 begin climb
478 44.4 - 57 490 roll 0.87 0.88 0.054 2684 381.8 2.55 0.062 3477 551.0 4.9 1.33 0.157 3367 -15.0 0.411 - - - - - - 25.60 25.53 25.43
821 9.3 9.9 103 832 done 0.87 - - 2680 - 2.40 0.039 2055 -592.5 5.9 - - 3369 - - - - - - - - - 25.61 -
884 end climb: SURFACE_DEPTH_REACHED
884 begin surface coast
921 end surface coast: CONTROL_FINISHED_OK
921 begin surface
SM 0.23 - - - - -7.00 6.93 0.047 125 -368.7 - - 2055 - 150.12 47.88 0.107 2780 -12.3 0.003 - - - - - -