Shilshole 12May23 * SG245 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 0.47 of 575.00 AH used of 24V (99.92% remains)
• Surface angle -28.3 deg, depth 0.92 m • Intended pitch -17.6 deg, speed -10.000 cm/s
VBD pumped to 637.60 (SM_CC=637.77997)
• GPS1 time: 1 s
• GPS2 time: 6 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
5 end surface: CONTROL_FINISHED_OK
5 begin dive
6.11 - - - 139.19 VBD -1.06 - - 207.06 - - - 2054.00 - -146.63 123.58 0.005 3487.44 - - - - - - - - - - 16.12
139.79 3.06 -1.66 24 177.09 -1.06 9.77 0.220 1544.88 136.9 3.53 0.120 3494.31 408.0 -146.63 5.84 0.008 3697.91 36.0 -2.282 - - - - - - 15.86 15.96 16.13
366.46 13.42 -3.12 67 381.42 roll back -1.75 1.17 0.120 1369.19 -150.2 3.47 0.056 1998.06 -431.2 -146.63 - - 3702.31 - - - - - - - - 15.90 16.00 -
565.69 20.50 -3.88 106 578.74 roll back -2.03 0.41 0.067 1292.44 -187.2 3.65 0.146 559.62 -394.1 -146.63 - - 3701.19 - - - - - - - - 15.95 15.90 -
798.05 34.97 -6.88 152 806.10 roll -2.10 - - 1292.25 - 3.45 0.055 2050.69 432.2 -146.63 - - 3701.75 - - - - - - - - - 15.97 -
905 end dive: HALF_MISSION_TIME_EXCEEDED
905 begin apogee
906.94 41.77 -6.46 173 1030.92 -0.25 2.95 0.117 1743.44 152.9 0.09 0.200 2050.56 - - 107.39 0.917 3099.69 -5.6 0.042 - - - - - - 15.88 15.52 10.37
1032 end apogee: CONTROL_FINISHED_OK
1032 begin climb
1032.32 39.85 - 195 1164.50 1.06 1.99 0.047 2070.44 164.3 3.93 0.145 560.88 -379.1 146.63 107.57 0.873 2500.12 -5.6 0.042 - - - - - - 15.60 15.40 10.64
1204 end climb: SURFACE_DEPTH_REACHED
1204 begin surface coast
1214 end surface coast: CONTROL_FINISHED_OK
1214 begin surface
SM 1.27 - - - - 194.4 333.82 0.835 500.7 1.2 11.81 0.063 573.2 48.4 - 3.48 0.056 428.2 121.9 -0.283 - - 10.63 15.65 15.68 -