Shilshole 31Mar22 * SG243 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 2 • 0.36 of 575.00 AH used of 24V (99.94% remains)
• 0.03 of 575.00 AH used of 10V (99.99% remains)
• Surface angle -44.1 deg, depth 1.33 m • Intended pitch -17.6 deg, speed -10.000 cm/s
VBD pumped to 603.01 (SM_CC=603.25)
• GPS1 time: 1 s
• GPS2 time: 2 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
4 end surface: CONTROL_FINISHED_OK
4 begin dive
4.91 - - - 118.24 VBD -0.88 - - 188.50 - - - 2052.44 - -146.63 111.21 0.005 3351.53 - - - - - - - - - - 16.21
118.51 3.29 -1.63 16 150.80 -0.88 15.49 0.262 2285.62 135.4 3.38 0.114 3495.44 426.9 -146.63 6.20 0.008 3595.81 39.4 -2.691 - - - - - - 15.97 16.08 16.21
378.98 36.46 -13.10 68 390.35 roll back -2.77 3.36 0.244 1824.88 -137.1 3.38 0.070 1998.00 -443.0 -146.63 - - 3600.81 - - - - - - - - 15.96 16.09 -
534 end dive: TARGET_DEPTH_EXCEEDED
534 begin apogee
535.15 45.01 -4.01 99 662.12 -0.20 3.81 0.059 2462.94 167.5 0.09 0.222 1998.56 - - 115.78 1.099 2998.91 -5.2 0.035 - - - - - - 16.08 15.69 10.91
662 end apogee: CONTROL_FINISHED_OK
662 begin climb
662.55 56.96 - 124 770.95 0.88 1.52 0.050 2725.12 172.5 3.60 0.123 555.88 -400.7 146.63 98.90 1.130 2397.47 -6.1 0.051 - - - - - - 15.73 15.51 11.21
879 end climb: SURFACE_DEPTH_REACHED
879 begin surface coast
889 end surface coast: CONTROL_FINISHED_OK
889 begin surface
SM 1.44 - - - - 198.3 295.54 1.081 541.8 1.5 16.92 0.147 652.7 38.5 - 3.41 0.058 430.8 125.3 -0.318 - - 11.23 15.70 15.77 -