Shilshole 05Nov14 * SG017 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 0.51 of 90.00 AH used of 24V (99.43% remains)
• Previous NAKs 0, Timeouts 0 • 0.98 of 78.00 AH used of 10V (98.74% remains)
• Surface angle -28.6 deg, depth 0.47 m • Intended pitch -20.3 deg, speed -10.000 cm/s
VBD pumped to 673.35 (SM_CC=673.16046)
• GPS1 time: 35 s, HDOP was 2.7 m
• GPS2 time: 13 s, HDOP was 2.6 m • Transponder ping count: 2
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
13 end surface: CONTROL_FINISHED_OK
13 begin dive
15 - - - 155 VBD -1.16 - - 579 - - - 2034 - -146.6 -136.57 - 3782 - - - - - - - - - - -
158 3.1 -6.8 23 178 roll -1.16 10.80 0.177 2443 172.6 2.00 0.079 3199 582.5 -146.6 -1.20 - 3835 -44.2 - - - - - - - 24.84 24.93 25.21
216 7.7 -5.2 33 223 done -1.16 - - 2443 - 1.98 0.054 2021 -594.9 -146.6 - - 3835 - - - - - - - - - 25.00 -
408 35.3 -16.7 70 415 roll -3.31 2.65 0.182 1984 -173.2 2.08 0.067 3199 566.3 -146.6 - - 3836 - - - - - - - - 24.83 24.99 -
523 end dive: TARGET_DEPTH_EXCEEDED
523 begin apogee
530 45.4 -8.7 92 647 done -0.25 2.85 0.043 2645 231.9 - - 2018 - - 110.03 0.724 3237 -5.4 0.035 - - - - - - 25.10 - 24.00
648 end apogee: CONTROL_FINISHED_OK
648 begin climb
650 64.1 - 102 766 roll 1.16 - - 2645 - 2.05 0.061 868 -561.0 146.6 109.10 0.712 2638 -5.5 0.051 - - - - - - - 24.48 23.99
879 51.4 22.7 151 883 done -0.12 - - 2645 - 1.98 0.044 2048 596.0 146.6 - - 2638 - - - - - - - - - 24.76 -
1066 8.9 21.4 188 1072 roll -1.32 - - 2645 - 1.95 0.069 3186 583.6 146.6 - - 2638 - - - - - - - - - 24.81 -
1102 end climb: SURFACE_DEPTH_REACHED
1102 begin surface coast
1114 end surface coast: CONTROL_FINISHED_OK
1114 begin surface
SM 0.58 - - - - -9.69 9.95 0.086 580 58.3 2.03 0.058 2023 868.5 673.35 287.00 0.101 492 1.7 -0.001 - - - - - -