ITOP Sep10 * SG169 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 2.88 of 150.00 AH used of 24V (98.08% remains)
• Previous NAKs 0, Timeouts 0 • 1.93 of 100.00 AH used of 10V (98.07% remains)
• Surface angle -74.9 deg, depth 1.21 m • Intended pitch -17.5 deg, speed -10.000 cm/s
VBD pumped to 560.02 (SM_CC=560.0199)
• GPS1 time: 12 s, HDOP was 2.4 m
• GPS2 time: 19 s, HDOP was 4.5 m • Transponder ping count: 57
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
12 end surface: CONTROL_FINISHED_OK
12 begin dive
14 - - - 103 done -0.60 - - 140 - - - 1993 - -146.0 -85.00 - 2671 - - - - - - - - - - -
105 2.0 -2.0 11 139 roll -0.60 9.68 0.253 2462 239.9 2.33 0.085 3427 615.5 -146.0 -15.73 - 3315 -40.9 - - - - - - - - - -
207 32.0 -34.3 26 216 done -0.15 0.52 0.202 2606 276.9 2.28 0.066 2000 -625.9 -146.0 - - 3315 - - - - - - - - - - -
253 end dive: TARGET_DEPTH_EXCEEDED
253 begin apogee
256 46.0 26.6 33 368 done -0.12 - - 2607 - - - 1999 - - 107.55 0.501 2718 -5.6 0.053 - - - - - - - - -
369 end apogee: CONTROL_FINISHED_OK
369 begin climb
370 67.2 - 47 499 roll 0.60 0.85 0.183 2845 280.0 2.35 0.057 3436 611.5 146.0 117.22 0.493 2118 -5.1 0.072 - - - - - - - - -
749 56.5 2.3 105 880 done 1.41 0.77 0.114 3111 345.5 2.25 0.050 1984 -645.3 312.0 124.38 0.486 1446 -5.4 0.065 - - - - - - - - -
1094 end climb: SURFACE_DEPTH_REACHED
1094 begin surface coast
1114 end surface coast: CONTROL_FINISHED_OK
1115 begin surface
SM 1.35 - - - - -7.88 - - 149 - - - 2025 - 560.02 147.18 0.429 434 -6.9 0.002 - - - - - -