ITOP Sep10 * SG168 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 4 • 2.61 of 150.00 AH used of 24V (98.26% remains)
• Previous NAKs 0, Timeouts 0 • 2.76 of 100.00 AH used of 10V (97.24% remains)
• Surface angle -79.3 deg, depth 1.15 m • Intended pitch -17.5 deg, speed -10.000 cm/s
VBD pumped to 569.34 (SM_CC=569.15326)
• GPS1 time: 12 s, HDOP was 3.0 m
• GPS2 time: 9 s • Transponder ping count: 55
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
12 end surface: CONTROL_FINISHED_OK
13 begin dive
14 - - - 111 VBD -0.62 - - 125 - - - 1855 - -146.0 -94.30 - 3308 - - - - - - - - - - -
113 3.4 -6.1 13 130 roll -0.62 10.25 0.213 2912 271.9 2.17 0.055 3269 651.6 -146.0 -1.08 - 3374 -61.1 - - - - - - - - - -
138 16.3 -39.3 16 147 done 1.08 1.80 0.167 3471 310.6 2.20 0.044 1842 -648.6 -146.0 - - 3375 - - - - - - - - - - -
451 end dive: TARGET_DEPTH_EXCEEDED
451 begin apogee
454 45.4 7.2 73 565 done -0.12 1.02 0.085 3089 -374.5 - - 1841 - - 105.07 0.493 2776 -5.7 0.052 - - - - - - - - -
566 end apogee: CONTROL_FINISHED_OK
566 begin climb
568 61.3 - 88 686 roll 0.62 0.70 0.125 3316 324.3 2.22 0.043 3253 636.0 146.0 110.00 0.503 2178 -5.4 0.065 - - - - - - - - -
871 58.2 3.1 138 990 done 1.70 0.95 0.084 3680 383.2 2.17 0.046 1862 -641.0 296.0 110.68 0.503 1568 -5.5 0.063 - - - - - - - - -
1141 end climb: SURFACE_DEPTH_REACHED
1141 begin surface coast
1154 end surface coast: CONTROL_FINISHED_OK
1154 begin surface
SM 1.01 - - - - -9.47 - - 103 - - - 1861 - 569.34 129.55 0.438 453 -8.6 0.002 - - - - - -