PortSusan 28Jun07 * SG001 * Dive index * Mission links * Dive 1 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 8.83 of 91.80 AH used of 24V (90.38% remains)
• Previous NAKs 0, Timeouts 0 • 1.30 of 61.20 AH used of 10V (97.88% remains)
• Surface angle -50.0 deg, depth 0.34 m • Intended pitch -20.0 deg, speed -10.000 cm/s
VBD pumped to 375.55 (SM_CC=375) • surface range 10.0 m at 9.8 m depth, ceiling -0.2 m
• GPS1 time: 34 s • bottom range 999.0 m at 76.1 m, depth 1075 m (100 m grid)
• GPS2 time: 18 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
37 end surface: CONTROL_FINISHED_OK
37 begin dive
43 - - - 127 done -1.21 - - 620 - - - 2167 - -121.6 -77.22 - 2768 - - - - - - - - - - -
133 3.2 -5.9 11 151 roll -1.21 7.05 - 2041 201.6 2.10 - 3541 654.3 -121.6 - - 2756 - - - - - - - - - - -
423 34.5 -10.0 58 432 done -1.21 0.32 - 1944 -303.1 3.12 - 1846 -543.3 -121.6 - - 2762 - - - - - - - - - - -
798 73.9 -11.4 119 807 roll -1.21 0.47 - 2026 174.5 2.92 - 3527 575.7 -121.6 - - 2768 - - - - - - - - - - -
1043 end dive: TARGET_DEPTH_EXCEEDED
1043 begin apogee
1059 100.0 10.0 159 1172 done -0.25 1.12 - 2282 228.6 - - 2005 - - 100.15 - 2261 -5.1 - - - - - - - - - -
1173 end apogee: CONTROL_FINISHED_OK
1173 begin climb
1178 105.5 - 165 1285 roll 1.21 1.67 - 2585 181.4 2.58 - 364 -636.0 121.6 97.35 - 1768 -5.1 - - - - - - - - - -
1564 65.1 12.2 214 1573 done 1.21 0.38 - 2499 -226.3 3.62 - 2149 493.1 121.6 - - 1768 - - - - - - - - - - -
1935 21.9 10.6 275 1944 roll 1.21 0.35 - 2606 305.7 2.92 - 411 -595.2 121.6 - - 1766 - - - - - - - - - - -
2128 end climb: SURFACE_DEPTH_REACHED
2129 begin surface coast
2165 end surface coast: CONTROL_FINISHED_OK
2165 begin surface
SM 0.34 - - - - -7.41 - - 612 - - - 2169 - 375.55 158.80 - 736 -6.5 INF - - - - - -