Shilshole 27Jun12 * SG166 * Dive index * Mission links
Based on high voltage useage over previous 7 dives:
    dives remaining   : 1939 (69.9 days at current dive duration)
    projected end date: 05-Sep-2012 21:21:48 (to 5% capacity)

Based on low voltage useage over previous 7 dives:
    dives remaining   : 1989 (71.7 days at current dive duration)
    projected end date: 07-Sep-2012 16:37:45 (to 5% capacity)

High voltage pack usage


Low voltage pack usage